move_punchlist [2018/05/10 16:43]
sdh7
move_punchlist [2018/05/11 11:04] (current)
sdh7
Line 1: Line 1:
-April 2018 - We are moving ​from The Dealership to IngenuityLabs at the Hamilton Collaborative. +April 2018 - We have moved from The Dealership to IngenuityLabs at the Hamilton Collaborative.
- +
-Tasks remaining to be done: +
-  * <​del>​Contain things into containers</​del>​ +
-  * <​del>​Disassemble shelves into whatever size needed for transport</​del>​ +
-  * <​del>​Call scrap hauling guy to haul away total junk we don't want. (still a ways off...)</​del>  ​+
  
 Things to do at Hamilton: Things to do at Hamilton:
-  * <​del>​Clean up debris in corner ​of pod. PPE suggested.<​/del> +  * 120V 20A run - get 50' ​of 12/3, use L5-20 connector from John K. and set up 4-outlet box by benches ​ 
-  * <​del>​Paint right wall of pod</​del>​ +
-  * <​del>​Use APC PDU to convert 240 to 120?</​del>​ Double-check the specs, ​and it would likely need some kind of extension cord to access outlet on the ceiling (estimated budget for 30' cord - ~$100, probably ​little under that) +
-    * Probably not Max voltage input on the "​PDU"​ is 230V, service is 240v. If service was 208V we'd be in business. +
-  * <​del>​Get a generator cable to split the 240 to 2x120 - costs about $35</​del>​.+
   * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units)   * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units)
     * Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each)     * Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each)
-  ​<​del>​pour concrete where the boards cover the void in the floorIs that allowed?</​del>​+    ​Plan C- Bob is getting some 8' 120V LED tubes???
   * Run ethernet cable to Soulcraft/​AO router - coordinate before plugging anything in...    * Run ethernet cable to Soulcraft/​AO router - coordinate before plugging anything in... 
-  * A stepstool/short ladder ​to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... +  * A stepstool to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... 
-  * Flooring? The floor in our pod is basically wood block. Cover it with something?+  * Organize things where they should go - re-label shelves to indicate contents 
 +  * Figure out what we're doing with the radio shack cabinets? 
 +  * Set up audio system
  