move_punchlist
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
move_punchlist [2018/04/09 21:58] – sdh7 | move_punchlist [2018/05/11 11:04] – sdh7 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | April 2018 - We are moving | + | April 2018 - We have moved from The Dealership to IngenuityLabs at the Hamilton Collaborative. |
- | + | ||
- | IMPORTANT: | + | |
- | * If you have big, unwieldy stuff that we don't have room for- MAKE IT GO AWAY. FOR REAL THIS TIME. It will either be given away or absorbed into the Hamilton Collaborative if you don't make it go away. | + | |
- | + | ||
- | Tasks remaining to be done: | + | |
- | * Contain things into containers | + | |
- | * < | + | |
- | * Call scrap hauling guy to haul away total junk we don't want. (still a ways off...) | + | |
- | + | ||
- | 4/10 PREP SESSION TO-DO LIST: | + | |
- | * get scrap guy's business card out of the file cabinet so we can call him when this is over with. | + | |
- | * empty green cabinet | + | |
- | * empty metal stock from pallet rack | + | |
- | * disassemble pallet rack | + | |
- | * empty server racks | + | |
- | * CLEAR ALL TABLES/ | + | |
- | * continue packing up stuff | + | |
- | + | ||
- | ==PRIORITY OF STUFF TO MOVE== | + | |
- | * Shelving - It's all apart and will fit in a truck bed or two (or three?) | + | |
- | * Pallet Racks - Mostly apart at this point, will fit in a truck bed? | + | |
- | * Flat stock/ | + | |
- | * Benches (computer) - will probably require a trailer | + | |
- | * Benches (workbenches) - trailer? | + | |
- | * Tables (3) - will fit in a truck bed, I think | + | |
- | * server racks (2) - the black one probably requires a trailer. the gray one might go in a truck. | + | |
- | * green shelves(? | + | |
- | * green cabinet | + | |
- | * bookshelf(? | + | |
- | * workbenches | + | |
- | * refrigerator | + | |
- | * file cabinet | + | |
- | * other big things I've forgotten. | + | |
- | * Boxes & things - fairly low priority | + | |
- | + | ||
- | Things that would be useful to have: | + | |
- | * Sturdy plastic tubs? liking [[https:// | + | |
Things to do at Hamilton: | Things to do at Hamilton: | ||
- | * Clean up debris in corner | + | * 120V 20A run - get 50' |
- | * Use APC PDU to convert 240 to 120? Double-check the specs, | + | |
- | * Probably not - Max voltage input on the " | + | |
* Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | ||
* Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each) | * Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each) | ||
- | | + | |
- | * pour concrete where the boards cover the void in the floor? Is that allowed? | + | * Run ethernet cable to Soulcraft/AO router |
- | * Run ethernet cable to Soulcraft router | + | * A stepstool to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... |
- | * A stepstool/short ladder | + | * Organize things where they should go - re-label shelves to indicate contents |
- | * Flooring? The floor in our pod is basically wood block. Cover it with something? | + | * Figure out what we're doing with the radio shack cabinets? |
+ | * Set up audio system | ||
- | Timeline: | ||
- | * Tuesday, 4/10 - Prep Session | ||
- | * Saturday, 4/14 - MOVE SESSION | ||
- | * Sunday, 4/15 - MOVE SESSION | ||
- | * Tuesday, 4/17 - Prep Session (anything left?) | ||
- | * Saturday, 4/21 - MOVE SESSION? (someone else would have to run) | ||
- | * Sunday, 4/22 - MOVE SESSION? (someone else would have to run) | ||
- | * Monday, 4/ | ||
- | * Saturday, 4/28 - Shaker Makers? | ||
- | * Sunday, 4/29 - Anything left? | ||
- | * Tuesday, 5/1 - Deadline for everything out |