 April 2018 - We are moving from The Dealership to IngenuityLabs at the Hamilton Collaborative. April 2018 - We are moving from The Dealership to IngenuityLabs at the Hamilton Collaborative.
- 
-IMPORTANT: 
-  * If you have big, unwieldy stuff that we don't have room for- MAKE IT GO AWAY. FOR REAL THIS TIME. It will either be given away or absorbed into the Hamilton Collaborative if you don't make it go away. 
  
 Tasks remaining to be done: Tasks remaining to be done:
-  * Contain things into containers +  * <del>Contain things into containers</del> 
-  * Disassemble shelves into whatever size needed for transport +  * <del>Disassemble shelves into whatever size needed for transport</del> 
-  *    +  * <del>Call scrap hauling guy to haul away total junk we don't want. (still ways off...)</del>  
-  +
-Timeline: +
-  * Tuesday, 4/3 - Prep Session +
-  * Friday, 4/6 (daytime prep session? maybe run small load over?) +
-  * Saturday, 4/7 - MOVE SESSION? (someone else should run?) +
-  * Tuesday, 4/10 - Prep Session +
-  * Saturday, 4/14 - MOVE SESSION +
-  * Sunday, 4/15 - MOVE SESSION? +
-  * Tuesday, 4/17 - Prep Session (anything left?) +
-  * Saturday, 4/21 - MOVE SESSION? (someone else would have to run) +
-  * Sunday, 4/22 - MOVE SESSION? (someone else would have to run) +
-  * Monday, 4/23-Friday, 4/27 - Sam is available all week for whatever is left +
-  * Saturday, 4/28 - Shaker Makers? +
-  * Sunday, 4/29 - Anything left? +
-  * Tuesday, 5/1 - Deadline for everything out+
  
-Things that would be useful to have+Things to do at Hamilton: 
-  * Sturdy plastic tubs?+  * <del>Clean up debris in corner of pod. PPE suggested.</del> 
 +  * <del>Paint right wall of pod</del> 
 +  * <del>Use APC PDU to convert 240 to 120?</del> Double-check the specs, and it would likely need some kind of extension cord to access outlet on the ceiling (estimated budget for 30' cord - ~$100, probably a little under that) 
 +    * Probably not - Max voltage input on the "PDU" is 230V, service is 240v. If service was 208V we'be in business. 
 +  * <del>Get a generator cable to split the 240 to 2x120 - costs about $35</del>
 +  * Replace fluorescent light with LED (budget$40/each for 3200 Lumen units) 
 +    * Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each) 
 +  * <del>pour concrete where the boards cover the void in the floor? Is that allowed?</del> 
 +  * Run ethernet cable to Soulcraft/AO router - coordinate before plugging anything in...  
 +  * A stepstool/short ladder to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... 
 +  * Flooring? The floor in our pod is basically wood block. Cover it with something?
  
-Things to do at Hamilton: 
-  * Clean up debris in corner of pod. 