April 2018 - We are moving from The Dealership to IngenuityLabs at the Hamilton Collaborative.

Tasks remaining to be done:

  • Contain things into containers
  • Disassemble shelves into whatever size needed for transport
  • Call scrap hauling guy to haul away total junk we don't want. (still a ways off…)

Things to do at Hamilton:

  • Clean up debris in corner of pod. PPE suggested.
  • Paint right wall of pod
  • Use APC PDU to convert 240 to 120? Double-check the specs, and it would likely need some kind of extension cord to access outlet on the ceiling (estimated budget for 30' cord - ~$100, probably a little under that)
    • Probably not - Max voltage input on the “PDU” is 230V, service is 240v. If service was 208V we'd be in business.
  • Get a generator cable to split the 240 to 2×120 - costs about $35.
  • Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units)
    • Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each)
  • pour concrete where the boards cover the void in the floor? Is that allowed?
  • Run ethernet cable to Soulcraft/AO router - coordinate before plugging anything in…
  • A stepstool/short ladder to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it…
  • Flooring? The floor in our pod is basically wood block. Cover it with something?