- | April 2018 - We are moving from The Dealership to IngenuityLabs at the Hamilton Collaborative. | ||
- | IMPORTANT: | ||
- | * If you have big, unwieldy stuff that we don't have room for- MAKE IT GO AWAY. FOR REAL THIS TIME. It will either be given away or absorbed into the Hamilton Collaborative if you don't make it go away. | ||
- | |||
- | Tasks remaining to be done: | ||
- | * Contain things into containers | ||
- | * Disassemble shelves into whatever size needed for transport | ||
- | * Call scrap hauling guy to haul away total junk we don't want. (still a ways off...) | ||
- | |||
- | Timeline: | ||
- | * Tuesday, 4/3 - Prep Session | ||
- | * Friday, 4/6 (daytime prep session? maybe run a small load over?) | ||
- | * Saturday, 4/7 - MOVE SESSION? (someone else should run?) | ||
- | * Tuesday, 4/10 - Prep Session | ||
- | * Saturday, 4/14 - MOVE SESSION | ||
- | * Sunday, 4/15 - MOVE SESSION | ||
- | * Tuesday, 4/17 - Prep Session (anything left?) | ||
- | * Saturday, 4/21 - MOVE SESSION? (someone else would have to run) | ||
- | * Sunday, 4/22 - MOVE SESSION? (someone else would have to run) | ||
- | * Monday, 4/ | ||
- | * Saturday, 4/28 - Shaker Makers? | ||
- | * Sunday, 4/29 - Anything left? | ||
- | * Tuesday, 5/1 - Deadline for everything out | ||
- | |||
- | Things that would be useful to have: | ||
- | * Sturdy plastic tubs? | ||
- | |||
- | Things to do at Hamilton: | ||
- | * Clean up debris in corner of pod. PPE suggested. | ||
- | * Use APC PDU to convert 240 to 120? Double-check the specs, and it would likely need some kind of extension cord to access outlet on the ceiling (estimated budget for 30' cord - ~$100, probably a little under that) | ||
- | * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | ||
- | * Paint pod? | ||
- | * pour concrete where the boards cover the void in the floor? Is that allowed? | ||
- | * Run ethernet cable to Soulcraft router | ||
- | * A stepstool/ | ||
- | * Flooring? |