- | ==(NOTE: This information is deprecated. We are not actively seeking a new location at the present moment.)== | ||
- | Requirements for a new potential space | ||
- | Required: | ||
- | * Minimum of x square feet (1,500? 2000? | ||
- | * Plenty of 110V & 220V electricity (multiple circuits, lots of outlets, etc.) | ||
- | * Ability to get 24/7 access for our members | ||
- | * Zoning & conditions such that typical woodworking & metalworking can be done indoors | ||
- | * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done outdoors (i.e. no worse than we have it right now) | ||
- | * Running water | ||
- | * High-speed internet connection | ||
- | * garage door/dock access (at least a fairly wide door) | ||
- | |||
- | Highly desirable, but not a deal-breaker: | ||
- | * 3-phase power | ||
- | * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done indoors | ||
- | * Ability to set our own access controls for new members to the space | ||
- | * static IP(s) for self-hosted servers | ||
- | * Access to kitchen facilities | ||
- | |||
- | Bonus requirements: | ||
- | * compressed air lines |