2017_potential_new_space_requirements
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| 2017_potential_new_space_requirements [2017/02/09 15:28] – sdh7 | 2017_potential_new_space_requirements [2018/04/18 14:30] (current) – removed sdh7 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ==(NOTE: This information is deprecated. We are not actively seeking a new location at the present moment.)== | ||
| - | Requirements for a new potential space | ||
| - | Required: | ||
| - | * Minimum of x square feet (1,500? 2000? | ||
| - | * Plenty of 110V & 220V electricity (multiple circuits, lots of outlets, etc.) | ||
| - | * Ability to get 24/7 access for our members | ||
| - | * Zoning & conditions such that typical woodworking & metalworking can be done indoors | ||
| - | * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done outdoors (i.e. no worse than we have it right now) | ||
| - | * Running water | ||
| - | * High-speed internet connection | ||
| - | * garage door/dock access (at least a fairly wide door) | ||
| - | |||
| - | Highly desirable, but not a deal-breaker: | ||
| - | * 3-phase power | ||
| - | * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done indoors | ||
| - | * Ability to set our own access controls for new members to the space | ||
| - | * static IP(s) for self-hosted servers | ||
| - | * Access to kitchen facilities | ||
| - | |||
| - | Bonus requirements: | ||
| - | * compressed air lines | ||
2017_potential_new_space_requirements.1486654130.txt.gz · Last modified: 2017/02/09 15:28 by sdh7