move_punchlist
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
move_punchlist [2018/04/18 10:36] – sdh7 | move_punchlist [2018/05/11 11:04] – sdh7 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | April 2018 - We are moving | + | April 2018 - We have moved from The Dealership to IngenuityLabs at the Hamilton Collaborative. |
- | + | ||
- | IMPORTANT: | + | |
- | * If you have big, unwieldy stuff that we don't have room for- MAKE IT GO AWAY. FOR REAL THIS TIME. It will either be given away or absorbed into the Hamilton Collaborative if you don't make it go away. | + | |
- | + | ||
- | Tasks remaining to be done: | + | |
- | * < | + | |
- | * < | + | |
- | * Call scrap hauling guy to haul away total junk we don't want. (still a ways off...) | + | |
- | + | ||
- | ==PRIORITY OF STUFF TO MOVE== | + | |
- | * Almost everything moved at this point | + | |
- | * Trash cans | + | |
- | * 2 chairs | + | |
- | * misc stuff | + | |
Things to do at Hamilton: | Things to do at Hamilton: | ||
- | * Clean up debris in corner | + | * 120V 20A run - get 50' |
- | * Paint right wall of pod | + | |
- | * < | + | |
- | * Probably not - Max voltage input on the " | + | |
- | * Get a generator cable to split the 240 to 2x120 - costs about $35. | + | |
* Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | ||
* Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each) | * Plan B- replace fluorescent tubes w/LED Drop-in replacements($7-10 each) | ||
- | | + | |
* Run ethernet cable to Soulcraft/ | * Run ethernet cable to Soulcraft/ | ||
- | * A stepstool/short ladder | + | * A stepstool to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... |
- | * Flooring? The floor in our pod is basically wood block. Cover it with something? | + | * Organize things where they should go - re-label shelves to indicate contents |
+ | * Figure out what we're doing with the radio shack cabinets? | ||
+ | * Set up audio system | ||
- | Timeline: | ||
- | * Tuesday, 4/10 - Prep Session | ||
- | * Saturday, 4/14 - MOVE SESSION | ||
- | * Sunday, 4/15 - MOVE SESSION | ||
- | * Tuesday, 4/17 - Prep Session (anything left?) | ||
- | * Saturday, 4/21 - MOVE SESSION? (someone else would have to run) | ||
- | * Sunday, 4/22 - MOVE SESSION? (someone else would have to run) | ||
- | * Monday, 4/ | ||
- | * Saturday, 4/28 - Shaker Makers? | ||
- | * Sunday, 4/29 - Anything left? | ||
- | * Tuesday, 5/1 - Deadline for everything out |