move_punchlist
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
move_punchlist [2018/04/02 14:45] – sdh7 | move_punchlist [2018/05/11 11:04] – sdh7 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | April 2018 - We are moving | + | April 2018 - We have moved from The Dealership to IngenuityLabs at the Hamilton Collaborative. |
- | + | ||
- | IMPORTANT: | + | |
- | * If you have big, unwieldy stuff that we don't have room for- MAKE IT GO AWAY. FOR REAL THIS TIME. It will either be given away or absorbed into the Hamilton Collaborative if you don't make it go away. | + | |
- | + | ||
- | Tasks remaining to be done: | + | |
- | * Contain things into containers | + | |
- | * Disassemble shelves into whatever size needed for transport | + | |
- | * Call scrap hauling guy to haul away total junk we don't want. (still a ways off...) | + | |
- | + | ||
- | Timeline: | + | |
- | * Tuesday, 4/3 - Prep Session | + | |
- | * Friday, 4/6 (daytime prep session? maybe run a small load over?) | + | |
- | * Saturday, 4/7 - MOVE SESSION? (someone else should run?) | + | |
- | * Tuesday, 4/10 - Prep Session | + | |
- | * Saturday, 4/14 - MOVE SESSION | + | |
- | * Sunday, 4/15 - MOVE SESSION | + | |
- | * Tuesday, 4/17 - Prep Session (anything left?) | + | |
- | * Saturday, 4/21 - MOVE SESSION? (someone else would have to run) | + | |
- | * Sunday, 4/22 - MOVE SESSION? (someone else would have to run) | + | |
- | * Monday, 4/ | + | |
- | * Saturday, 4/28 - Shaker Makers? | + | |
- | * Sunday, 4/29 - Anything left? | + | |
- | * Tuesday, 5/1 - Deadline for everything out | + | |
- | + | ||
- | Things that would be useful to have: | + | |
- | * Sturdy plastic tubs? | + | |
Things to do at Hamilton: | Things to do at Hamilton: | ||
- | * Clean up debris in corner | + | * 120V 20A run - get 50' |
- | * Use APC PDU to convert 240 to 120? Double-check the specs, and it would likely need some kind of extension cord to access | + | |
* Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | * Replace fluorescent light with LED (budget: $40/each for 3200 Lumen units) | ||
- | | + | |
- | * pour concrete where the boards cover the void in the floor? | + | * Plan C- Bob is getting some 8' 120V LED tubes??? |
- | * Run ethernet cable to Soulcraft router | + | * Run ethernet cable to Soulcraft/AO router |
+ | * A stepstool to reach shelf tops? We'll have to better utilize shelf top space - no more empty boxes lining the shelves if we can help it... | ||
+ | * Organize things where they should go - re-label shelves to indicate contents | ||
+ | * Figure out what we're doing with the radio shack cabinets? | ||
+ | * Set up audio system |