User Tools

Site Tools


2016_potential_new_space_requirements

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

2016_potential_new_space_requirements [2016/10/30 17:11] – external edit 127.0.0.12016_potential_new_space_requirements [2017/01/17 19:27] (current) – removed sdh7
Line 1: Line 1:
-Requirements for a new potential space 
  
-Required: 
-  * Minimum of x square feet (1,500? 2000? (I think we have ~1000 right now) 
-  * Plenty of 110V & 220V electricity (multiple circuits, lots of outlets, etc.) 
-  * Ability to get 24/7 access for our members 
-  * Zoning & conditions such that typical woodworking & metalworking can be done indoors 
-  * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done outdoors (i.e. no worse than we have it right now) 
-  * Running water 
-  * High-speed internet connection 
-  * garage door/dock access (at least a fairly wide door) 
- 
-Highly desirable, but not a deal-breaker: 
-  * 3-phase power 
-  * Zoning & conditions such that welding, plasma cutting, and/or vehicle work could be done indoors 
-  * Ability to set our own access controls for new members to the space 
-  * static IP(s) for self-hosted servers 
-  * Access to kitchen facilities 
- 
-Bonus requirements: 
-  * compressed air lines 
2016_potential_new_space_requirements.1477847477.txt.gz · Last modified: 2017/01/17 19:27 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki